2023 Jordan Telecom Group/ Orange-To Swap Current Switchgear (ATS) at Abdali and Tlaa Al-Ali Data Centers to Overcome Single Point of Failure, Part of Data Centers Power Backbone Project Abdali & Tlaa Al-Ali
2023 Jordan Telecom Group/ Orange-Data Centers Power Backbone Project/ New Switchgear Marj Al-Hamam
2022 Jordan Telecom Group/ Orange-Supplying and Installing New Power Connection Feeders for The OPC Project Marj Al-Hamam
2022 Jordan Telecom Group/ Orange-Supplying and Installing Power Containers Requires for Switchgear Modernization Hashem
2022 Jordan Telecom Group/ Orange-Supplying and Installing Needed Materials Related to The Power Distribution Expansion Project to Feed The Cooling Modernization Amman
2022 Jordan Telecom Group/ Orange-Switchgear Modernization Hashem
2021 Jordan Telecom Group/ Orange-Supplying and Installing New AC Panels and Cables Marj Al-Hamam & Hashem
2021 Jordan Telecom Group/ Orange-Supplying and Installing DC Panel Irbed
2021 Jordan Telecom Group/ Orange-Supplying and Installing Power and Energy Meters for Remote Access with Network Amman
2021 Jordan Telecom Group/ Orange-Supplying and Installing DC Dual Source Panels and Cables for The FTTH New Site Amman
2016 Jordan Telecom Group/ Orange-Tier Iii Marj Al-Hamam