All Projects

Marj Alhamam Data Centers power backbone / New Switchgears – Tier III

Owner

Jordan Telecommunications company (Orange)

Commissioning Date

2023

Scope of Supply

Two ATS 1600A

One Transformer Panel-1600A

Two Main Distribution Boards – 1600A

One Tie Panel – 1600A

New Switchgears – Tier III / Tla’a Ali & Abdali sites

Owner

Jordan Telecommunications company (Orange)

Commissioning Date

2023

Scope of Supply

One ATS- 3 source 1600A

One Transformer Panel-1600A

One Main Distribution Boards – 1600A

One Sub-Main Distribution Boards – 1250A

Two By-pass Panel – 1600A

 

DARA RESTAURANT

Owner

DARA RESTAURANT

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2023

Scope of Supply

1 Sub-main Distribution Panel Boards

 

1 Motor Control Centers

 

CAIRO AMMAN BANK – SHAPSUG BRANCH

Owner

CAIRO AMMAN BANK

Commissioning Date

2023

Scope of Supply

2 Sub-main Distribution Panel Board

 

Ritz Carlton Hotel & Residences

Owner Al-Eqbal Real Estate Development & Hotels
Contractor Matta Et Associes SAL / MAG engineering & contracting
Commissioning Date 2022 2022
Scope of Supply Five Main Distribution Boards (Form 4b, fully type tested – 2500A) Four Power Factor Correction Panel 300KVAR Thirty-four Sub-Main Distribution Boards Twelve Motor Control Center Panels One hundred twenty Final Distribution Boards Two hundred thirty Guest room Distribution Boards

Hashem data Center / New Switchgears – Tier III

Owner

Jordan Telecommunications company (Orange)

Commissioning Date

2022

Scope of Supply

Two ATS 2500A

Four By-pass Panel – 2500A

One Transformer Panel-2500A

Two Main Distribution Boards – 2500A

One Tie Panel – 2500A

 

500KW PV system / Jordan Oil Terminals Company

Owner

Jordan Oil Terminals Company

Contractor

Mustakbal Clean Tech.

Commissioning Date

2022

Scope of Supply

One Main Connection Boards – 1000A

One AC combiner Box 600A

One AC combiner Box 400A

Two Final Distribution Boards

 

Marj Alhamam data Center / New Switchgears for chillers system – Tier III

Owner

Jordan Telecommunications company (Orange)

Commissioning Date

2021

Scope of Supply

Two Main Distribution Boards – 1250A

Two Sub-Main Distribution Boards – 1250A

Three ATS 630A

Two Motor Control Center Panels – 400A

Two UPS Panels – 250A

 

New Factory sahab / Siniora Food industries

Owner

Siniora Food industries

Contractor

Net contracting est.

Commissioning Date

2021

Scope of Supply One

One Main Distribution Boards – 2500A

One ATS 2500A

One Power Factor Correction Panel 500KVAR

Two Sub-Main Distribution Boards

Two Motor Control Center Panels

Five Final Distribution Boards

 

AL SAUDI HOSPITAL

Owner

AL SAUDI HOSPITAL

Commissioning Date

2021

Scope of Supply

2 Main Distribution Panel Boards with Bus Coupler

 1 Main Distribution Panel Board for Generator

 12 Sub-main Distribution Panel Boards

 7 Motor Control Centers

 11 VFD’S from 0.75 KW to 45KW

 1 ATS 2500A

 1 ATS 2500A

 2 Power factor correction panel 400kvar

 

CAIRO AMMAN BANK – Wadi Saqra

Owner

Cairo Amman Bank

Commissioning Date

2022

Scope of Supply

1 Main Distribution Panel Board

 

VILLA MR. SAÁD MUA’SHER

Owner

Owner: MR. SAÁD MUA’SHER

Contractor

Contractor: Al-Muntaser Engineering Contracting Co.

Commissioning Date

2022

Scope of Supply

1 Sub-main Distribution Panel Boards

1 Motor Control Centers

3 Final Distribution Panel Boards

 

Wadi Mousa Water Supply & Waste Water- Project No. 1W

Owner

Water Authority of Jordan

Consultant

CDM International Inc.

Contractor

Diran Contracting Company

Commissioning Date

2000

Scope of Supply

One Autotransformer Starter- 320kW

One master PLC unit

Two Remote Telemetric Units (RTU’s)

One Mimic panel to control & monitor the whole system

SCADA system

Training of operator

MOONEH DRY HANGER

Owner

Mooneh Logistics Company

Commissioning Date

2022

Scope of Supply

1 Sub-main Distribution Panel Boards

9 Final Distribution Panel Boards with control & contactors For lighting

 

Hikma – Alsalt new QC Labs / Electrical Panels

Owner

Hikma – Al salt

Contractor

Assariya Electro-Mechanical contractors

Commissioning Date

2022

Scope of Supply

Two Sub-Main Distribution Boards

Two Motor Control Center Panels

Seven Final Distribution Boards

 

APM – SALT

Owner

HIKMA

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date: 2022

2022

Scope of Supply

2 Sub-main Distribution Panel Board

 

APM – SALT

Owner

HIKMA

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date: 2022

2022

Scope of Supply

2 Sub-main Distribution Panel Board

 

AL SAUDI HOSPITAL

Owner

AL SAUDI HOSPITAL

Commissioning Date

2021

Scope of Supply

2 Main Distribution Panel Boards with Bus Coupler

 1 Main Distribution Panel Board for Generator

 12 Sub-main Distribution Panel Boards

 7 Motor Control Centers

 11 VFD’S from 0.75 KW to 45KW

 1 ATS 2500A

 1 ATS 2500A

 2 Power factor correction panel 400kvar

 

Marj Alhamam data Center / New Switchgears for chillers system – Tier III

Owner

Jordan Telecommunications company (Orange)

Commissioning Date

2021

Scope of Supply

Two Main Distribution Boards – 1250A

Two Sub-Main Distribution Boards – 1250A

Three ATS 630A

Two Motor Control Center Panels – 400A

Two UPS Panels – 250A

 

New Factory sahab / Siniora Food industries

Owner

Siniora Food industries

Contractor

Net contracting est.

Commissioning Date

2021

Scope of Supply One

One Main Distribution Boards – 2500A

One ATS 2500A

One Power Factor Correction Panel 500KVAR

Two Sub-Main Distribution Boards

Two Motor Control Center Panels

Five Final Distribution Boards

 

CITY MALL

Owner

Al-Khayr Real Estate Investment Company

Commissioning Date

2021

Scope of Supply

2 Sub-main Distribution Panel Boards

 

HIKMA / PP – COUNTEC SECONDARY EXPANSION

Owner

Hikma

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

2 Sub-main Distribution Panel Boards

 2 Motor Control Centers

 

VILLA Dr. MEDHAT ABDEL MALEK

Owner

Dr. MEDHAT ABDEL MALEK

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

2 Sub-main Distribution Panel Boards

2 Motor Control Centers

3 Final Distribution Panel Boards

 

Villa Mr. Zaid Shbailat / Electrical Panels

Owner

Mr. Zaid Shbailat

Contractor

Ammon Electro-Mechanical contractors

Commissioning Date

2021

Scope of Supply

One Main Distribution Boards

One ATS 250A

Two Sub-Main Distribution Boards

Three Motor Control Center Panels

Four Final Distribution Boards

 

APM – SAHAB DISPENSING UTILITIES ROOM

Owner

HIKMA

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

1 Sub-main Distribution Panel Boards

1 Motor Control Centers

4 Final Distribution Panel Boards

 

NOOR TAREQ CENTER

Owner

NOOR TAREQ CENTER

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2021

Scope of Supply

1 Main Distribution Panel Board

5 Sub-main Distribution Panel Boards

3 Motor Control Centers

2 Final Distribution Panel Boards with control & contactors For lighting

 

SWEDISH EMBASSY

Owner

SWEDISH EMBASSY

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2021

Scope of Supply

1 Main Distribution Panel Board

1 Sub-main Distribution Panel Board

1 Motor Control Center

1 ATS 400A

11 Final Distribution Panel Boards

 

SWEDISH EMBASSY

Owner

SWEDISH EMBASSY

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2021

Scope of Supply

1 Main Distribution Panel Board

1 Sub-main Distribution Panel Board

1 Motor Control Center

1 ATS 400A

11 Final Distribution Panel Boards

 

Villa Mr. Zaid Shbailat / Electrical Panels

Owner

Mr. Zaid Shbailat

Contractor

Ammon Electro-Mechanical contractors

Commissioning Date

2021

Scope of Supply

One Main Distribution Boards

One ATS 250A

Two Sub-Main Distribution Boards

Three Motor Control Center Panels

Four Final Distribution Boards

 

APM – SAHAB DISPENSING UTILITIES ROOM

Owner

HIKMA

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

1 Sub-main Distribution Panel Boards

1 Motor Control Centers

4 Final Distribution Panel Boards

 

NOOR TAREQ CENTER

Owner

NOOR TAREQ CENTER

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2021

Scope of Supply

1 Main Distribution Panel Board

5 Sub-main Distribution Panel Boards

3 Motor Control Centers

2 Final Distribution Panel Boards with control & contactors For lighting

 

NOOR TAREQ CENTER

Owner

NOOR TAREQ CENTER

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2021

Scope of Supply

1 Main Distribution Panel Board

5 Sub-main Distribution Panel Boards

3 Motor Control Centers

2 Final Distribution Panel Boards with control & contactors For lighting

 

New Factory sahab / Siniora Food industries

Owner

Siniora Food industries

Contractor

Net contracting est.

Commissioning Date

2021

Scope of Supply One

One Main Distribution Boards – 2500A

One ATS 2500A

One Power Factor Correction Panel 500KVAR

Two Sub-Main Distribution Boards

Two Motor Control Center Panels

Five Final Distribution Boards

 

CITY MALL

Owner

Al-Khayr Real Estate Investment Company

Commissioning Date

2021

Scope of Supply

2 Sub-main Distribution Panel Boards

 

HIKMA / PP – COUNTEC SECONDARY EXPANSION

Owner

Hikma

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

2 Sub-main Distribution Panel Boards

 2 Motor Control Centers

 

VILLA Dr. MEDHAT ABDEL MALEK

Owner

Dr. MEDHAT ABDEL MALEK

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

2 Sub-main Distribution Panel Boards

2 Motor Control Centers

3 Final Distribution Panel Boards

 

Villa Mr. Zaid Shbailat / Electrical Panels

Owner

Mr. Zaid Shbailat

Contractor

Ammon Electro-Mechanical contractors

Commissioning Date

2021

Scope of Supply

One Main Distribution Boards

One ATS 250A

Two Sub-Main Distribution Boards

Three Motor Control Center Panels

Four Final Distribution Boards

 

APM – SAHAB DISPENSING UTILITIES ROOM

Owner

HIKMA

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2021

Scope of Supply

1 Sub-main Distribution Panel Boards

1 Motor Control Centers

4 Final Distribution Panel Boards

 

NOOR TAREQ CENTER

Owner

NOOR TAREQ CENTER

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2021

Scope of Supply

1 Main Distribution Panel Board

5 Sub-main Distribution Panel Boards

3 Motor Control Centers

2 Final Distribution Panel Boards with control & contactors For lighting

 

MRE FACTORY / ALQASTAL – JORDAN

Owner

LOYALTY SUPPORT SERVICES

Contractor

Awabeen Contracting Co.

Commissioning Date

2020

Scope of Supply

1 Main Distribution Panel Board – Form 2, Design Verification for Type – tested assemblies

 8 Sub-main Distribution Panel Boards Form 2, Design Verification for Type – tested assemblies

 5 Motor Control Centers

 9 VFD’S from 7.5 KW to 22KW

 1 ATS 2500A

 1 Power factor correction panel 500kvar

 37 Final Distribution Panel Boards with control & contactors For lighting

 

PHARMA INTERNATIONAL COMPANY

Owner

PHARMA INTERNATIONAL COMPANY

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2020

Scope of Supply

8 Sub-main Distribution Panel Boards

 

MRE FACTORY / ALQASTAL – JORDAN

Owner

LOYALTY SUPPORT SERVICES

Contractor

Awabeen Contracting Co.

Commissioning Date

2020

Scope of Supply

1 Main Distribution Panel Board – Form 2, Design Verification for Type – tested assemblies

 8 Sub-main Distribution Panel Boards Form 2, Design Verification for Type – tested assemblies

 5 Motor Control Centers

 9 VFD’S from 7.5 KW to 22KW

 1 ATS 2500A

 1 Power factor correction panel 500kvar

 37 Final Distribution Panel Boards with control & contactors For lighting

 

PHARMA INTERNATIONAL COMPANY

Owner

PHARMA INTERNATIONAL COMPANY

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2020

Scope of Supply

8 Sub-main Distribution Panel Boards

 

THE RENOVATION OF API STERILE AREA- HIKMA

Owner

Hikma

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2019

Scope of Supply

2 Sub-main Distribution Panel Boards

 2 Motor Control Centers

 4 Final Distribution Panel Boards

 

ANALTICAL LAB – HIKMA – AlBAYADER

Owner

Hikma

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2019

Scope of Supply

1 Main Distribution Board

 6 Sub-main Distribution Panel Boards

 1 ATS 630A

 

MOONEH HANGER -6

Owner

Mooneh Logistics Company

Commissioning Date

2019

Scope of Supply

3 Sub-main Distribution Panel Boards

2 Final Distribution Panel Boards with control & contactors For lighting

 

VILLA MR. JBOURI

Owner

MR. JBOURI

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2019

Scope of Supply

1 Main Distribution Panel Board

1 Sub-main Distribution Panel Boards

3 Final Distribution Panel Boards

 

ANALTICAL LAB – HIKMA – AlBAYADER

Owner

Hikma

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2019

Scope of Supply

1 Main Distribution Board

 6 Sub-main Distribution Panel Boards

 1 ATS 630A

 

PEPSI FACTORY

Owner

PEPSI CO.

Contractor

Spectrum Energy Solutions Company (SESCO)

Commissioning Date

2019

Scope of Supply

3 LT Panel Board

 

 3 Main Distribution Panel Boards

 

 3 Power factor correction panel 425kvar

 

 1 MTS 2500A

 

EAGER LION

Contractor

TANATRAH Contracting Co.

Commissioning Date

2019

Scope of Supply

1 LT Panel Board

 

8 Main Distribution Panel Boards

 

2 MTS 100A.

 

EMBASSY OF JAPAN

Owner

EMBASSY OF JAPAN

Commissioning Date

2019

Scope of Supply

1 ATS 800A

 

SHERATON HOTEL / POOL BAR AND TOILETS

Owner

SHERATON HOTEL

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2019

Scope of Supply

 

2 Sub-main Distribution Panel Boards

5 Final Distribution Panel Boards

 

PEPSI FACTORY

Owner

PEPSI CO.

Contractor

Spectrum Energy Solutions Company (SESCO)

Commissioning Date

2019

Scope of Supply

3 LT Panel Board

 

 3 Main Distribution Panel Boards

 

 3 Power factor correction panel 425kvar

 

 1 MTS 2500A

 

THE RENOVATION OF API STERILE AREA- HIKMA

Owner

Hikma

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2019

Scope of Supply

2 Sub-main Distribution Panel Boards

 2 Motor Control Centers

 4 Final Distribution Panel Boards

 

Cargill Premix & Nutrition

Contractor

Assariya Electro-Mechanical Contractors

Commissioning Date

2018

Scope of Supply

One Main Distribution board.

One Power Factor Compensation panel- 350Kvar

Three Sub-Main Distribution boards

One Control board for lighting

Jordanian Egyptian Fajr for Natural Gas Warehouse

Owner

 

Consultant

UCS- Universal Consultancy Services

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2017

Scope of Supply

One Main Distribution board.

Two Sub-Main Distribution boards

One Motor Control Center board



Darb for Trading & Refrigeration

Owner

Darb for Trading & Refrigeration

Commissioning Date

2017

Scope of Supply

Two Main Distribution boards, form-IV, fed through two transformers- 1.5MVA each

One Automatic Transfer Switch- 3200A

One Automatic Transfer Switch- 2000A

One Power Factor Compensation panel- 600Kvar

One Power Factor Compensation panel- 800Kvar

Five Sub-Main Distribution boards

5MWp PV system in Kempenski Hotel

Owner

Kempenski Hotel

Contractor

Mustakbal Clean Tech

Commissioning Date

2016

Scope of Supply

Twenty-nine AC combiner boxes

Prince Hashem Station/ Automatic Transfer Switch- 1600A

Owner

Jordan Telecom Group- Orange

Commissioning Date

2016

Scope of Supply

Supply, install and commission of Two way Automatic Transfer Switch, 1600A with bypass switch



5MWp PV system in Jordan University of Science and Technology

Owner

Jordan University of Science and Technology

Contractor

Mustakbal Clean Tech

Commissioning Date

2016

Scope of Supply

Twenty-eight AC combiner boxes

1208kWp PV system in Mooneh Trading Co.

Owner

Mooneh Trading Co.

Contractor

Izzat Marji Group

Commissioning Date

2016

Scope of Supply

Main Distribution board

Two Sub-Main Distribution boards

TIER III Data Center in Jordan Telecom Group- Orange

Owner

Jordan Telecom Group- Orange

Consultant

Uptime Institute

Contractor

MEC- Modern Electro-Technical corp.

Commissioning Date

2016

Scope of Supply

Two Main Distribution boards, each consists of a main incomer, 2500A

One tie breakers panel, 2500A

Two Automatic Transfer Switches, 2500A with bypass switch



Siniora Food Industries Company

Owner

Siniora Food Industries Company

Contractor

Net Contracting Est.

Commissioning Date

2015

Scope of Supply

One Main Distribution board, form-II, fed through transformer- 1.5MVA

Two Main Distribution boards, form-II, fed through transformer- 1 MVA

One Main Distribution board, form-II

One Automatic Transfer Switch- 1600A

Two Power Factor Compensation panels- 300Kvar

Six Sub-Main Distribution boards

Three Motor Control Center boards

Twenty-two Final Distribution boards with control & contactors for lighting



SARL SOPROVET Veterinary Plant- Algeria

Owner

SARL SOPROVET Veterinary Plant- Algeria

Contractor

Poineer Pharma Consultancy

Commissioning Date

2015

Scope of Supply

One Main Distribution board, form-II, fed through transformer- 1 MVA

One Power Factor Compensation panel- 200Kvar

Two Sub-Main Distribution boards

Six Motor Control Center boards

Fourteen Final Distribution boards with control & contactors for lighting

700kWp PV system in International Amman Academy

Owner

International Amman Academy

Contractor

Farig Energia Srl

Commissioning Date

2015

Scope of Supply

Five AC combiner boxes

Twenty-two MCB boxes

Five connection boxes

Cosmodar

Owner

Cosmodar

Commissioning Date

2015

Scope of Supply

One Main Distribution board, form-IV, fed through transformer- 1.5MVA

One Main Distribution board, form-IV

One Sub-Main Distribution board

Three Motor Control Center boards



Alf Lela Walela Hotel

Owner

Alf Lela Walela Hotel

Commissioning Date

2014

Scope of Supply

One Main Distribution board, form-II, fed through transformer- 1.5MVA

One Main Distribution board, form-II, fed through transformer- 1MVA

One Automatic Transfer Switch- 250A

One Power Factor Compensation panel- 200Kvar

Seven Sub-Main Distribution boards

Four Motor Control Center boards

One hundred sixteen Final Distribution boards with control & contactors for lighting



Sama Cow Farm

Owner

Sama for Investment and Trading Depots

Consultant

UCS- Universal Consultancy Services

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2014

Scope of Supply

Two Main Distribution boards, form-IV, fed through two transformers- 1.5MVA each

2 Automatic Transfer Switches

One Power Factor Compensation panel- 150Kvar

Six Sub-Main Distribution boards

Four Motor Control Center boards

28 Final Distribution boards with control & contactors for lighting

Jordan Media Center

Owner

Jordan Media Center

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2014, 2007

Scope of Supply

One Main Distribution Board that consists of two main incomers & one bus-coupler

One Junction Box- 2000A

One Sub-Main Distribution boards

Two Motor Control Center boards

Five Sub-Main Distribution boards

One Power Factor Compensation panel- 300kvar

One Manual Change-over Switch 630A, 4-pole

One Manual Change-over Switch 800A, 4-pole

One Manual Change-over Switch 1250A, 4-pole

Societe Generale Bank Jordan (SGBJ) DATA CENETR

Owner

SGBJ

Contractor

Jordan Data Systems

Commissioning Date

2013

Scope of Supply

Three Main Distribution boards, Form-IVb, (Type Tested Assemblies/ PRISMA Plus-P)

Two Sub-Main Distribution boards, Form-IVb, (Type Tested Assemblies/ PRISMA Plus-P) equipped with three- way ATS

Two Final Distribution boards, Form-IIb, (Type Tested Assemblies/ PRISMA Plus-G)



Al-Taher Real Develpoment Co.

Contractor

Awwabeen Contracting Company

Consultant

Karim Bawab & Co.

Commissioning Date

2013

Scope of Supply

Four Motor Control Center boards controlled by Building management system

Eight Variable speed drives, up to 95kW

Two Power Factor Compensation panel- 200kvar

Two Low Voltage Panels

Eight Sub-Main Distribution Boards

One Automatic Transfer Switch- 1600A

Eighteen Final Distribution Boards



Orthodox Club

Consultant

Faisal A. N. Qaqish Eng. office

Commissioning Date

2013

Scope of Supply

One Main Distribution board, fed through transformer- 1.5MVA, that consists of main incomer, 2500A ACB.

One Automatic Transfer Switch- 630A

One Main Distribution board, fed through Automatic Transfer Switch- 630A, that consists of main incomer, 800A MCCB.

One Sub-Main Distribution board

One Power Factor Compensation panel- 500kVar

Wadi Mousa Water Supply & Waste Water- Project No. 1W

Sama High End Retail (Centro Supermarket)

Owner

Sama for Investment and Trading Depots

Consultant

UCS- Universal Consultancy Services

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2013

Scope of Supply

Two Main Distribution boards, form-IV, fed through two transformers- 1.5MVA each, consists of two main incomers, motorized ACB’s, with bus-coupler complete with electrical & mechanical interlock

Two Automatic Transfer Switches- 2500A each

Two Power Factor Compensation panels- each 300Kvar

Fifteen Sub-Main Distribution boards

Four Motor Control Center boards

Twenty-four Final Distribution boards with control & contactors for lighting

Petra Food Factory

Contractor

Al-Sayyar for Electrical Engineering

Commissioning Date

2013

Scope of Supply

One Main Distribution board, Form-IV, fed from one transformer- 1.5MVA

One Automatic Transfer Switch- 2500A

Five Sub-Main Distribution boards

Five Motor Control Center boards

One Power Factor Compensation panel- 500kvar

Thirty-Five Final Distribution boards with control & contactors for lighting



1MWp PV system in Ma’an Development Area

Owner

Ma’an Development Area

Contractor

Mustakbal Clean Tech

Commissioning Date

2013

Scope of Supply

Two Main Distribution boards

Two Sub-Main Distribution board



AL- Gardens Hospital

Owner

AL- Gardens Hospital

Contractor

Venice for Contracting

Commissioning Date

2013/2012

Scope of Supply

One Main Distribution board, Form-IV, fed through two transformers- 1.5MVA each, that consists of two main incomers, motorized ACB’s, with bus-coupler complete with electrical & mechanical interlock

Eighteen Sub-Main Distribution boards

Seven Motor Control Center boards

Two Power Factor Compensation panels- 400kvar

Forty-three Final Distribution boards with control & contactors for lighting

8000A Synchronizing Panel- Dream City Project- Iraq

Owner

Modern Iraqi for Trading Agencies

Contractor

Modern Iraqi for Trading Agencies

Commissioning Date

2012

Scope of Supply

One Synchronizing panel for four Generators, that consists of six 1600A motorized ACB’s & two 1000A outgoing MCCB’s & six 630A outgoing MCCB’s, with load sharing & load Demand, all control and bus bars

Arab Pharmaceutical Manufacturing (APM)

Owner

Arab Pharmaceutical Manufacturing (APM).

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2012

Scope of Supply

One Main Distribution board (type tested assemblies/PRISMA Plus-P), Form-IV, fed through one transformer- 1.5MVA

One Automatic Transfer Switch- 630A

Six Sub-Main Distribution boards

Four Motor Control Center boards

One Power Factor Compensation panel- 450kvar

Eleven Final Distribution boards with control & contactors for lighting



Dar Al-Dawa Pharmaceutical Co.- General Formulation Plant

Owner

Dar Al dawa

Consultant

Alpha Ref. & Air Cond. Est.

Contractor

Alpha Ref. & Air Cond. Est.

Commissioning Date

2012/2011

Scope of Supply

Two Main Distribution boards, Form-IV, fed through two transformers- 1.5MVA each, that consist of two main incomers, motorized ACB’s, with Bus- coupler complete with electrical & mechanical interlock

Twenty Sub-Main Distribution boards

Fifteen Motor Control Center boards

Four Power Factor Compensation panels- 400kvar

Thirty-two Final Distribution boards with control & contactors for lighting



10000A Synchronizing Panel- Iraq

Owner

Modern Iraqi for Trading Agencies

Contractor

Modern Iraqi for Trading Agencies

Commissioning Date

2011

Scope of Supply

One Synchronizing panel for Six Generators, that consists of six 2000A motorized ACB’s & six 2000A outgoing MCCB’s, with load sharing & load Demand, all control and bus bars

Royal Jordanian Headquarter

Owner

Royal Jordanian

Contractor

Haddadinco

Commissioning Date

2011

Scope of Supply

Two Main Distribution boards, Form-IV, fed through two transformers- 1.5MVA each, that consist of two main incomers, motorized ACB’s, with Bus- coupler complete with electrical & mechanical interlock

Twenty-Two Sub-Main Distribution boards

Fourteen Motor Control Center boards

Four Power Factor Compensation panels- 400kvar

Sixty-three Final Distribution boards with control & contactors for lighting

Gargour& Fils Auto Center- Wadi Al-Seer

Owner

T. Gargour & Fils Auto Company

Consultant

Karim Bawab & Co.

Contractor

T. Gargour & Fils Auto Company

Commissioning Date

2010

Scope of Supply

One Main Distribution board, fed from one transformer- 0.6MVA

Four Sub-Main Distribution boards

Three Motor Control Center boards

Twenty Final Distribution boards with control & contactors for lighting

 

Modern Arab Distribution Company

Owner

Nader Group

Contractor

Awwabeen Contracting Company

Commissioning Date

2010

Scope of Supply

One Main Distribution board, fed from one transformer- 0.4MVA

Two Sub-Main Distribution boards

Two Motor Control Center boards

One Automatic Transfer Switch-100A

Ten Final Distribution boards with control & contactors for lighting



6300A Synchronizing Panel- Kardo Group- Iraq

Owner

Modern Iraqi for Trading Agencies

Contractor

Modern Iraqi for Trading Agencies

Commissioning Date

2010

Scope of Supply

One Synchronizing panel for five Generators, that consists of five, 1250A motorized MCCB’s & two 3200A MCCB’s, with all control and bus bars

MTN (Telecommunication Company)- Yemen

Owner

MTN Company

Contractor

Technohouse Engineering & Contracting

Commissioning Date

2009

Scope of Supply

Two Main Distribution boards, Form-IV, fed through two transformers- 1.5MVA each, that consist of two main incomers, motorized ACB’s, with bus-coupler complete with electrical & mechanical interlock

Two Automatic Transfer Switches- 2500A

Ten Sub-Main Distribution boards

Eight Motor Control Center boards

Four Power Factor Compensation panels- 450kvar

Thirty Final Distribution boards with Control & contactors for lighting.

5000A Synchronizing Panel (Auchan Project)- Iraq

Owner

Modern Iraqi for Trading Agencies

Contractor

Modern Iraqi for Trading Agencies

Commissioning Date

2009

Scope of Supply

One Synchronizing panel for four generators, that consists of four 1600A motorized MCCB’s & two 2000A MCCB’s, with all control and bus bars



Al-Hamshari Group Building

Owner

Al-Hamshari Group

Contractor

Al-Sayyar for Electrical Engineering

Commissioning Date

2008

Scope of Supply

One Main Distribution board

Two Motor Control Center boards

Two Sub-Main Distribution boards

Fourteen Final Distribution boards with control & contactors for lighting



Union Tobacco Ware House

Owner

Union Tobacco

Consultant

UCS- Universal Consultancy Services

Contractor

Eng. Nabil Sehani Co.

Commissioning Date

2008

Scope of Supply

One Sub-Main Distribution board

Eight Final Distribution boards with control & contactors for lighting

Coca Cola Factory- Yemen

Owner

Aden Beverage and Industrial Co.

Contractor

Technohouse Engineering & Contracting

Commissioning Date

2008

Scope of Supply

One Main Distribution boards, Form-IV, fed through one transformer- 2MVA

Six Sub-Main Distribution boards

Four Motor Control Center boards

One Power Factor Compensation panels- 600kvar

Twenty-three Final Distribution boards with control & contactors for lighting

Jingo’s Jungle

Owner

Carnival Amusements & Entertainment Co.

Contractor

Awwabeen Contracting Company

Commissioning Date

2008

Scope of Supply

One Main Distribution Board

Two Motor Control Center boards

Four Sub-Main Distribution boards

Four Final Distribution boards with control & contactors for lighting



Main Data Center for Orange Company- (Prince Hashem Station)

Owner

Jordan Telecom Group- Orange

Commissioning Date

2008

Scope of Supply

Supply, install and commission of low voltage switchgear cabinets including all cable installations and terminations (power and data cables) with all cable trays and accessories

Execute a grounding system according to ANSI J-STD- 607- A standard

Lightning System (Meshed Cages) according to IEC 62305-2



ACT Administration Building

Owner

Aqaba Container Terminal

Contractor

Mag Engineering & Contracting Co.

Commissioning Date

2008- 2007

Scope of Supply

Two Main Distribution boards

Two Motor Control Center boards

One Sub-Main Distribution board

Fifteen Final Distribution boards with control & contactors for lighting

Union Tobacco Administration Building

Owner

Union Tobacco

Consultant

UCS- Universal Consultancy Services

Contractor

Eng. Nabil Sehani Co.

Commissioning Date

2008-2007

Scope of Supply

One Main Distribution board

One Motor Control Center board

One Sub-Main Distribution board

Four Final Distribution boards with control & contactors for lighting

ABC Department Store

Owner

Al-Baraka Mall

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2008-2007

Scope of Supply

One Main Distribution board

One Motor Control Center board

Three Sub-Main Distribution boards

Two Final Distribution boards with control & contactors for lighting



Integrated Wood Industry Factory

Owner

الشركة الاردنية الخليجية لصناعة المفروشات

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2008-2007

Scope of Supply

One Main Distribution Board

Eight Sub-Main Distribution boards

Three Motor Control Center boards

One Power Factor Compensation panel- 350kvar



6000A Synchronizing Panel

Owner

S.E.T.I

Contractor

S.E.T.I

Commissioning Date

2008-2007

Scope of Supply

One Synchronizing panel for three Generators that consist of three motorized ACB’s with all control and bus bars

Infrastructure Upgrading & Renovation of Switchgear Panels for Orange Company- (Al-Abdali Station)

Owner

Jordan Telecom Group- Orange

Commissioning Date

2007

Scope of Supply

Supply, Install and Commission:

Automatic Transfer Switch- 1000A, 4-pole

One two-way Automatic Transfer Switch- 1000A and by-pass switch

Jordan Media Center

Owner

Jordan Media Center

Contractor

Al-Muntaser Engineering Contracting Co.

Commissioning Date

2007

Scope of Supply

One Main Distribution Board that consists of two main incomers & one bus-coupler

Two Motor Control Center boards

Five Sub-Main Distribution boards

One Power Factor Compensation panel- 300kvar.



Infrastructure Upgrading & Renovation of Switchgear Panels for Orange Company- (Tlaa’ Al-Ali Branch)

Owner

Jordan Telecom Group- Orange

Commissioning Date

2007-2006

Scope of Supply

Supply, Install and Commission:

One Main Distribution board

One two-way Automatic Transfer Switch- 1000A and by-pass switch



City Mall Project

Owner

Al-Khayer Real Estate Investment Company

Consultant

UCS- Universal Consultancy Services

Contractor

Alpha Refrigeration & Air Conditioning Est.

Commissioning Date

2007- 2005

Scope of Supply

Six LV Transformer panels, Form-IV

Six Main Distribution boards, Form-IV

Twelve Motor Control Center boards, Form-II

Twenty Six Sub-Main Distribution boards, Form-II

Three Power Factor Compensation panels, two 450kvar & one 150kvar

Final Distribution boards

Infrastructure Upgrading & Renovation of Switchgear Panels for Orange Company- (Prince Hashem Station)

Owner

Jordan Telecom Group- Orange

Commissioning Date

2006

Scope of Supply

Supply, Install and Commission:

One Automatic Transfer Switch- 1000A, 4-pole

A new controlling and monitoring micro- processor based panel for existing Generator

Infrastructure Upgrading & Renovation of Mobilecom Main Building- (7th Circle Branch)

Owner

Jordan Telecom Group- Orange

Commissioning Date

2006-2005

Scope of Supply

Supply, install and commission of Automatic Transfer Switch- 1000A, 4-pole



Infrastructure Upgrading & Renovation for Military Hospitals/ King Hussein Medical City

Owner

Armed Jordan Forces Royal Medical Services

Consultant

Arabtech Jardaneh Consulting Engineers & Architects

Contractor

Anass Anani & Partners Contracting Co.

Commissioning Date

2003- 2002

Scope of Supply

Three Main Distribution boards, Prisma Form-IV, ASTA type tested (authorized by Schneider Electric)

Nine Motor Control Center boards, Form-II

Seventeen Sub-Main Distribution boards

Two Power Factor Compensation panels- 450kvar & 180kvar

Final Distribution boards



Infrastructure Upgrading & Renovation for Military Hospitals/ Prince Hashim Hospital

Owner

Armed Jordan Forces Royal Medical Services

Consultant

Arabtech Jardaneh Consulting Engineers & Architects

Contractor

Haddadin Engineering Co. for Contracting

Commissioning Date

2003- 2002

Scope of Supply

Three Main Distribution boards, Prisma Form-IV, ASTA type tested (authorized by Schneider Electric)

Seven Motor Control Center boards Form-II

Two Sub-Main Distribution boards

Two Power Factor Compensation panels- 300kvar & 120kvar

Final Distribution boards

Amman Water Project- C9

Owner

Water Authority of Jordan

Consultant

SEGMA

Contractor

Hussein Attieh Contracting Est.

Commissioning Date

2002

Scope of Supply

Main Distribution board

Twelve Soft Starters- up to 450kW

Four Variable Speed Drives

One master PLC unit

Eight Remote Telemetric units (RTU’s)

One Main Mimic panel to control & monitor the system of each site

SCADA system

Wireless system for five sites

Training of operators

Amman Water Project- C2

Owner

Water Authority of Jordan

Consultant

SEGMA

Contractor

Hussein Attieh Contracting Est.

Commissioning Date

2002

Scope of Supply

One Motor Control Center board

Two Autotransformer Starters- 90kWEach

One master PLC unit

Three Remote Telemetric units (RTU’s)

One Mimic panel to control & monitor the whole system including the MV Pumps

SCADA system

Training of operators



Farah Hospital

Owner

Farah Hospital

Consultant

MEDA Consulting Engineers

Contractor

Modern Maintenance Company

Commissioning Date

2001

Scope of Supply

Main Distribution board, fed through two transformers- 1500 MVA each

Fifteen Sub-Main Distribution board

Six Motor Control Center boards, Form-IV, with provision of remote control through BMS

Two Power Factor Compensation boards- 400kvar each



Wadi Mousa Water Supply & Waste Water- Project No. 2W

Owner

Water Authority of Jordan

Consultant

CDM International Inc.

Contractor

Sadeq Naief & Partners Contracting Company

Commissioning Date

2000

Scope of Supply

Three Autotransformer Starters- 320kW, located in the Pumping Stations

One master PLC unit

Seven Remote Telemetric Units (RTU’s)

One Mimic panel to control & monitor the whole system

SCADA system

Training of operators

Wadi Mousa Water Supply & Waste Water- Project No. 1W

Owner

Water Authority of Jordan

Consultant

CDM International Inc.

Contractor

Diran Contracting Company

Commissioning Date

2000

Scope of Supply

One Autotransformer Starter- 320kW

One master PLC unit

Two Remote Telemetric Units (RTU’s)

One Mimic panel to control & monitor the whole system

SCADA system

Training of operator