Marj Alhamam Data Centers power backbone / New Switchgears – Tier III
Owner | Jordan Telecommunications company (Orange) |
Commissioning Date | 2023 |
Scope of Supply | Two ATS 1600A One Transformer Panel-1600A Two Main Distribution Boards – 1600A One Tie Panel – 1600A |
New Switchgears – Tier III / Tla’a Ali & Abdali sites
Owner | Jordan Telecommunications company (Orange) |
Commissioning Date | 2023 |
Scope of Supply | One ATS- 3 source 1600A One Transformer Panel-1600A One Main Distribution Boards – 1600A One Sub-Main Distribution Boards – 1250A Two By-pass Panel – 1600A |
DARA RESTAURANT
Owner | DARA RESTAURANT |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2023 |
Scope of Supply | 1 Sub-main Distribution Panel Boards |
| 1 Motor Control Centers |
CAIRO AMMAN BANK – SHAPSUG BRANCH
Owner | CAIRO AMMAN BANK |
Commissioning Date | 2023 |
Scope of Supply | 2 Sub-main Distribution Panel Board |
Ritz Carlton Hotel & Residences
| Owner | Al-Eqbal Real Estate Development & Hotels |
| Contractor | Matta Et Associes SAL / MAG engineering & contracting |
| Commissioning Date 2022 | 2022 |
| Scope of Supply | Five Main Distribution Boards (Form 4b, fully type tested – 2500A) Four Power Factor Correction Panel 300KVAR Thirty-four Sub-Main Distribution Boards Twelve Motor Control Center Panels One hundred twenty Final Distribution Boards Two hundred thirty Guest room Distribution Boards |
Hashem data Center / New Switchgears – Tier III
Owner | Jordan Telecommunications company (Orange) |
Commissioning Date | 2022 |
Scope of Supply | Two ATS 2500A Four By-pass Panel – 2500A One Transformer Panel-2500A Two Main Distribution Boards – 2500A One Tie Panel – 2500A |
500KW PV system / Jordan Oil Terminals Company
Owner | Jordan Oil Terminals Company |
Contractor | Mustakbal Clean Tech. |
Commissioning Date | 2022 |
Scope of Supply | One Main Connection Boards – 1000A One AC combiner Box 600A One AC combiner Box 400A Two Final Distribution Boards |
Marj Alhamam data Center / New Switchgears for chillers system – Tier III
Owner | Jordan Telecommunications company (Orange) |
Commissioning Date | 2021 |
Scope of Supply | Two Main Distribution Boards – 1250A Two Sub-Main Distribution Boards – 1250A Three ATS 630A Two Motor Control Center Panels – 400A Two UPS Panels – 250A |
New Factory sahab / Siniora Food industries
Owner | Siniora Food industries |
Contractor | Net contracting est. |
Commissioning Date | 2021 |
Scope of Supply One | One Main Distribution Boards – 2500A One ATS 2500A One Power Factor Correction Panel 500KVAR Two Sub-Main Distribution Boards Two Motor Control Center Panels Five Final Distribution Boards |
AL SAUDI HOSPITAL
Owner | AL SAUDI HOSPITAL |
Commissioning Date | 2021 |
Scope of Supply | 2 Main Distribution Panel Boards with Bus Coupler 1 Main Distribution Panel Board for Generator 12 Sub-main Distribution Panel Boards 7 Motor Control Centers 11 VFD’S from 0.75 KW to 45KW 1 ATS 2500A 1 ATS 2500A 2 Power factor correction panel 400kvar |
CAIRO AMMAN BANK – Wadi Saqra
Owner | Cairo Amman Bank |
Commissioning Date | 2022 |
Scope of Supply | 1 Main Distribution Panel Board |
VILLA MR. SAÁD MUA’SHER
Owner | Owner: MR. SAÁD MUA’SHER |
Contractor | Contractor: Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2022 |
Scope of Supply | 1 Sub-main Distribution Panel Boards 1 Motor Control Centers 3 Final Distribution Panel Boards |
Wadi Mousa Water Supply & Waste Water- Project No. 1W
Owner | Water Authority of Jordan |
Consultant | CDM International Inc. |
Contractor | Diran Contracting Company |
Commissioning Date | 2000 |
Scope of Supply | One Autotransformer Starter- 320kW One master PLC unit Two Remote Telemetric Units (RTU’s) One Mimic panel to control & monitor the whole system SCADA system Training of operator |
MOONEH DRY HANGER
Owner | Mooneh Logistics Company |
Commissioning Date | 2022 |
Scope of Supply | 1 Sub-main Distribution Panel Boards 9 Final Distribution Panel Boards with control & contactors For lighting |
Hikma – Alsalt new QC Labs / Electrical Panels
Owner | Hikma – Al salt |
Contractor | Assariya Electro-Mechanical contractors |
Commissioning Date | 2022 |
Scope of Supply | Two Sub-Main Distribution Boards Two Motor Control Center Panels Seven Final Distribution Boards |
APM – SALT
Owner | HIKMA |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date: 2022 | 2022 |
Scope of Supply | 2 Sub-main Distribution Panel Board |
APM – SALT
Owner | HIKMA |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date: 2022 | 2022 |
Scope of Supply | 2 Sub-main Distribution Panel Board |
AL SAUDI HOSPITAL
Owner | AL SAUDI HOSPITAL |
Commissioning Date | 2021 |
Scope of Supply | 2 Main Distribution Panel Boards with Bus Coupler 1 Main Distribution Panel Board for Generator 12 Sub-main Distribution Panel Boards 7 Motor Control Centers 11 VFD’S from 0.75 KW to 45KW 1 ATS 2500A 1 ATS 2500A 2 Power factor correction panel 400kvar |
Marj Alhamam data Center / New Switchgears for chillers system – Tier III
Owner | Jordan Telecommunications company (Orange) |
Commissioning Date | 2021 |
Scope of Supply | Two Main Distribution Boards – 1250A Two Sub-Main Distribution Boards – 1250A Three ATS 630A Two Motor Control Center Panels – 400A Two UPS Panels – 250A |
New Factory sahab / Siniora Food industries
Owner | Siniora Food industries |
Contractor | Net contracting est. |
Commissioning Date | 2021 |
Scope of Supply One | One Main Distribution Boards – 2500A One ATS 2500A One Power Factor Correction Panel 500KVAR Two Sub-Main Distribution Boards Two Motor Control Center Panels Five Final Distribution Boards |
CITY MALL
Owner | Al-Khayr Real Estate Investment Company |
Commissioning Date | 2021 |
Scope of Supply | 2 Sub-main Distribution Panel Boards |
HIKMA / PP – COUNTEC SECONDARY EXPANSION
Owner | Hikma |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 2 Sub-main Distribution Panel Boards 2 Motor Control Centers |
VILLA Dr. MEDHAT ABDEL MALEK
Owner | Dr. MEDHAT ABDEL MALEK |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 2 Sub-main Distribution Panel Boards 2 Motor Control Centers 3 Final Distribution Panel Boards |
Villa Mr. Zaid Shbailat / Electrical Panels
Owner | Mr. Zaid Shbailat |
Contractor | Ammon Electro-Mechanical contractors |
Commissioning Date | 2021 |
Scope of Supply | One Main Distribution Boards One ATS 250A Two Sub-Main Distribution Boards Three Motor Control Center Panels Four Final Distribution Boards |
APM – SAHAB DISPENSING UTILITIES ROOM
Owner | HIKMA |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 1 Sub-main Distribution Panel Boards 1 Motor Control Centers 4 Final Distribution Panel Boards |
NOOR TAREQ CENTER
Owner | NOOR TAREQ CENTER |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2021 |
Scope of Supply | 1 Main Distribution Panel Board 5 Sub-main Distribution Panel Boards 3 Motor Control Centers 2 Final Distribution Panel Boards with control & contactors For lighting |
SWEDISH EMBASSY
Owner | SWEDISH EMBASSY |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2021 |
Scope of Supply | 1 Main Distribution Panel Board 1 Sub-main Distribution Panel Board 1 Motor Control Center 1 ATS 400A 11 Final Distribution Panel Boards |
SWEDISH EMBASSY
Owner | SWEDISH EMBASSY |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2021 |
Scope of Supply | 1 Main Distribution Panel Board 1 Sub-main Distribution Panel Board 1 Motor Control Center 1 ATS 400A 11 Final Distribution Panel Boards |
Villa Mr. Zaid Shbailat / Electrical Panels
Owner | Mr. Zaid Shbailat |
Contractor | Ammon Electro-Mechanical contractors |
Commissioning Date | 2021 |
Scope of Supply | One Main Distribution Boards One ATS 250A Two Sub-Main Distribution Boards Three Motor Control Center Panels Four Final Distribution Boards |
APM – SAHAB DISPENSING UTILITIES ROOM
Owner | HIKMA |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 1 Sub-main Distribution Panel Boards 1 Motor Control Centers 4 Final Distribution Panel Boards |
NOOR TAREQ CENTER
Owner | NOOR TAREQ CENTER |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2021 |
Scope of Supply | 1 Main Distribution Panel Board 5 Sub-main Distribution Panel Boards 3 Motor Control Centers 2 Final Distribution Panel Boards with control & contactors For lighting |
NOOR TAREQ CENTER
Owner | NOOR TAREQ CENTER |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2021 |
Scope of Supply | 1 Main Distribution Panel Board 5 Sub-main Distribution Panel Boards 3 Motor Control Centers 2 Final Distribution Panel Boards with control & contactors For lighting |
New Factory sahab / Siniora Food industries
Owner | Siniora Food industries |
Contractor | Net contracting est. |
Commissioning Date | 2021 |
Scope of Supply One | One Main Distribution Boards – 2500A One ATS 2500A One Power Factor Correction Panel 500KVAR Two Sub-Main Distribution Boards Two Motor Control Center Panels Five Final Distribution Boards |
CITY MALL
Owner | Al-Khayr Real Estate Investment Company |
Commissioning Date | 2021 |
Scope of Supply | 2 Sub-main Distribution Panel Boards |
HIKMA / PP – COUNTEC SECONDARY EXPANSION
Owner | Hikma |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 2 Sub-main Distribution Panel Boards 2 Motor Control Centers |
VILLA Dr. MEDHAT ABDEL MALEK
Owner | Dr. MEDHAT ABDEL MALEK |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 2 Sub-main Distribution Panel Boards 2 Motor Control Centers 3 Final Distribution Panel Boards |
Villa Mr. Zaid Shbailat / Electrical Panels
Owner | Mr. Zaid Shbailat |
Contractor | Ammon Electro-Mechanical contractors |
Commissioning Date | 2021 |
Scope of Supply | One Main Distribution Boards One ATS 250A Two Sub-Main Distribution Boards Three Motor Control Center Panels Four Final Distribution Boards |
APM – SAHAB DISPENSING UTILITIES ROOM
Owner | HIKMA |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2021 |
Scope of Supply | 1 Sub-main Distribution Panel Boards 1 Motor Control Centers 4 Final Distribution Panel Boards |
NOOR TAREQ CENTER
Owner | NOOR TAREQ CENTER |
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2021 |
Scope of Supply | 1 Main Distribution Panel Board 5 Sub-main Distribution Panel Boards 3 Motor Control Centers 2 Final Distribution Panel Boards with control & contactors For lighting |
MRE FACTORY / ALQASTAL – JORDAN
Owner | LOYALTY SUPPORT SERVICES |
Contractor | Awabeen Contracting Co. |
Commissioning Date | 2020 |
Scope of Supply | 1 Main Distribution Panel Board – Form 2, Design Verification for Type – tested assemblies 8 Sub-main Distribution Panel Boards Form 2, Design Verification for Type – tested assemblies 5 Motor Control Centers 9 VFD’S from 7.5 KW to 22KW 1 ATS 2500A 1 Power factor correction panel 500kvar 37 Final Distribution Panel Boards with control & contactors For lighting |
PHARMA INTERNATIONAL COMPANY
Owner | PHARMA INTERNATIONAL COMPANY |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2020 |
Scope of Supply | 8 Sub-main Distribution Panel Boards |
MRE FACTORY / ALQASTAL – JORDAN
Owner | LOYALTY SUPPORT SERVICES |
Contractor | Awabeen Contracting Co. |
Commissioning Date | 2020 |
Scope of Supply | 1 Main Distribution Panel Board – Form 2, Design Verification for Type – tested assemblies 8 Sub-main Distribution Panel Boards Form 2, Design Verification for Type – tested assemblies 5 Motor Control Centers 9 VFD’S from 7.5 KW to 22KW 1 ATS 2500A 1 Power factor correction panel 500kvar 37 Final Distribution Panel Boards with control & contactors For lighting |
PHARMA INTERNATIONAL COMPANY
Owner | PHARMA INTERNATIONAL COMPANY |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2020 |
Scope of Supply | 8 Sub-main Distribution Panel Boards |
THE RENOVATION OF API STERILE AREA- HIKMA
Owner | Hikma |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply | 2 Sub-main Distribution Panel Boards 2 Motor Control Centers 4 Final Distribution Panel Boards |
ANALTICAL LAB – HIKMA – AlBAYADER
Owner | Hikma |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply | 1 Main Distribution Board 6 Sub-main Distribution Panel Boards 1 ATS 630A |
MOONEH HANGER -6
Owner | Mooneh Logistics Company |
Commissioning Date | 2019 |
Scope of Supply | 3 Sub-main Distribution Panel Boards 2 Final Distribution Panel Boards with control & contactors For lighting |
VILLA MR. JBOURI
Owner | MR. JBOURI |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply | 1 Main Distribution Panel Board 1 Sub-main Distribution Panel Boards 3 Final Distribution Panel Boards |
ANALTICAL LAB – HIKMA – AlBAYADER
Owner | Hikma |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply | 1 Main Distribution Board 6 Sub-main Distribution Panel Boards 1 ATS 630A |
PEPSI FACTORY
Owner | PEPSI CO. |
Contractor | Spectrum Energy Solutions Company (SESCO) |
Commissioning Date | 2019 |
Scope of Supply | 3 LT Panel Board |
| 3 Main Distribution Panel Boards |
| 3 Power factor correction panel 425kvar |
| 1 MTS 2500A |
EAGER LION
Contractor | TANATRAH Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply | 1 LT Panel Board |
| 8 Main Distribution Panel Boards |
| 2 MTS 100A. |
EMBASSY OF JAPAN
Owner | EMBASSY OF JAPAN |
Commissioning Date | 2019 |
Scope of Supply | 1 ATS 800A |
SHERATON HOTEL / POOL BAR AND TOILETS
Owner | SHERATON HOTEL |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply
| 2 Sub-main Distribution Panel Boards 5 Final Distribution Panel Boards |
PEPSI FACTORY
Owner | PEPSI CO. |
Contractor | Spectrum Energy Solutions Company (SESCO) |
Commissioning Date | 2019 |
Scope of Supply | 3 LT Panel Board |
| 3 Main Distribution Panel Boards |
| 3 Power factor correction panel 425kvar |
| 1 MTS 2500A |
THE RENOVATION OF API STERILE AREA- HIKMA
Owner | Hikma |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2019 |
Scope of Supply | 2 Sub-main Distribution Panel Boards 2 Motor Control Centers 4 Final Distribution Panel Boards |
Cargill Premix & Nutrition
Contractor | Assariya Electro-Mechanical Contractors |
Commissioning Date | 2018 |
Scope of Supply | One Main Distribution board. One Power Factor Compensation panel- 350Kvar Three Sub-Main Distribution boards One Control board for lighting |
Jordanian Egyptian Fajr for Natural Gas Warehouse
Owner |
|
Consultant | UCS- Universal Consultancy Services |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2017 |
Scope of Supply | One Main Distribution board. Two Sub-Main Distribution boards One Motor Control Center board |
Darb for Trading & Refrigeration
Owner | Darb for Trading & Refrigeration |
Commissioning Date | 2017 |
Scope of Supply | Two Main Distribution boards, form-IV, fed through two transformers- 1.5MVA each One Automatic Transfer Switch- 3200A One Automatic Transfer Switch- 2000A One Power Factor Compensation panel- 600Kvar One Power Factor Compensation panel- 800Kvar Five Sub-Main Distribution boards |
5MWp PV system in Kempenski Hotel
Owner | Kempenski Hotel |
Contractor | Mustakbal Clean Tech |
Commissioning Date | 2016 |
Scope of Supply | Twenty-nine AC combiner boxes |
Prince Hashem Station/ Automatic Transfer Switch- 1600A
Owner | Jordan Telecom Group- Orange |
Commissioning Date | 2016 |
Scope of Supply | Supply, install and commission of Two way Automatic Transfer Switch, 1600A with bypass switch |
5MWp PV system in Jordan University of Science and Technology
Owner | Jordan University of Science and Technology |
Contractor | Mustakbal Clean Tech |
Commissioning Date | 2016 |
Scope of Supply | Twenty-eight AC combiner boxes |
1208kWp PV system in Mooneh Trading Co.
Owner | Mooneh Trading Co. |
Contractor | Izzat Marji Group |
Commissioning Date | 2016 |
Scope of Supply | Main Distribution board Two Sub-Main Distribution boards |
TIER III Data Center in Jordan Telecom Group- Orange
Owner | Jordan Telecom Group- Orange |
Consultant | Uptime Institute |
Contractor | MEC- Modern Electro-Technical corp. |
Commissioning Date | 2016 |
Scope of Supply | Two Main Distribution boards, each consists of a main incomer, 2500A One tie breakers panel, 2500A Two Automatic Transfer Switches, 2500A with bypass switch |
Siniora Food Industries Company
Owner | Siniora Food Industries Company |
Contractor | Net Contracting Est. |
Commissioning Date | 2015 |
Scope of Supply | One Main Distribution board, form-II, fed through transformer- 1.5MVA Two Main Distribution boards, form-II, fed through transformer- 1 MVA One Main Distribution board, form-II One Automatic Transfer Switch- 1600A Two Power Factor Compensation panels- 300Kvar Six Sub-Main Distribution boards Three Motor Control Center boards Twenty-two Final Distribution boards with control & contactors for lighting |
SARL SOPROVET Veterinary Plant- Algeria
Owner | SARL SOPROVET Veterinary Plant- Algeria |
Contractor | Poineer Pharma Consultancy |
Commissioning Date | 2015 |
Scope of Supply | One Main Distribution board, form-II, fed through transformer- 1 MVA One Power Factor Compensation panel- 200Kvar Two Sub-Main Distribution boards Six Motor Control Center boards Fourteen Final Distribution boards with control & contactors for lighting |
700kWp PV system in International Amman Academy
Owner | International Amman Academy |
Contractor | Farig Energia Srl |
Commissioning Date | 2015 |
Scope of Supply | Five AC combiner boxes Twenty-two MCB boxes Five connection boxes |
Cosmodar
Owner | Cosmodar |
Commissioning Date | 2015 |
Scope of Supply | One Main Distribution board, form-IV, fed through transformer- 1.5MVA One Main Distribution board, form-IV One Sub-Main Distribution board Three Motor Control Center boards |
Alf Lela Walela Hotel
Owner | Alf Lela Walela Hotel |
Commissioning Date | 2014 |
Scope of Supply | One Main Distribution board, form-II, fed through transformer- 1.5MVA One Main Distribution board, form-II, fed through transformer- 1MVA One Automatic Transfer Switch- 250A One Power Factor Compensation panel- 200Kvar Seven Sub-Main Distribution boards Four Motor Control Center boards One hundred sixteen Final Distribution boards with control & contactors for lighting |
Sama Cow Farm
Owner | Sama for Investment and Trading Depots |
Consultant | UCS- Universal Consultancy Services |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2014 |
Scope of Supply | Two Main Distribution boards, form-IV, fed through two transformers- 1.5MVA each 2 Automatic Transfer Switches One Power Factor Compensation panel- 150Kvar Six Sub-Main Distribution boards Four Motor Control Center boards 28 Final Distribution boards with control & contactors for lighting |
Jordan Media Center
Owner | Jordan Media Center |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2014, 2007 |
Scope of Supply | One Main Distribution Board that consists of two main incomers & one bus-coupler One Junction Box- 2000A One Sub-Main Distribution boards Two Motor Control Center boards Five Sub-Main Distribution boards One Power Factor Compensation panel- 300kvar One Manual Change-over Switch 630A, 4-pole One Manual Change-over Switch 800A, 4-pole One Manual Change-over Switch 1250A, 4-pole |
Societe Generale Bank Jordan (SGBJ) DATA CENETR
Owner | SGBJ |
Contractor | Jordan Data Systems |
Commissioning Date | 2013 |
Scope of Supply | Three Main Distribution boards, Form-IVb, (Type Tested Assemblies/ PRISMA Plus-P) Two Sub-Main Distribution boards, Form-IVb, (Type Tested Assemblies/ PRISMA Plus-P) equipped with three- way ATS Two Final Distribution boards, Form-IIb, (Type Tested Assemblies/ PRISMA Plus-G) |
Al-Taher Real Develpoment Co.
Contractor | Awwabeen Contracting Company |
Consultant | Karim Bawab & Co. |
Commissioning Date | 2013 |
Scope of Supply | Four Motor Control Center boards controlled by Building management system Eight Variable speed drives, up to 95kW Two Power Factor Compensation panel- 200kvar Two Low Voltage Panels Eight Sub-Main Distribution Boards One Automatic Transfer Switch- 1600A Eighteen Final Distribution Boards |
Orthodox Club
Consultant | Faisal A. N. Qaqish Eng. office |
Commissioning Date | 2013 |
Scope of Supply | One Main Distribution board, fed through transformer- 1.5MVA, that consists of main incomer, 2500A ACB. One Automatic Transfer Switch- 630A One Main Distribution board, fed through Automatic Transfer Switch- 630A, that consists of main incomer, 800A MCCB. One Sub-Main Distribution board One Power Factor Compensation panel- 500kVar Wadi Mousa Water Supply & Waste Water- Project No. 1W |
Sama High End Retail (Centro Supermarket)
Owner | Sama for Investment and Trading Depots |
Consultant | UCS- Universal Consultancy Services |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2013 |
Scope of Supply | Two Main Distribution boards, form-IV, fed through two transformers- 1.5MVA each, consists of two main incomers, motorized ACB’s, with bus-coupler complete with electrical & mechanical interlock Two Automatic Transfer Switches- 2500A each Two Power Factor Compensation panels- each 300Kvar Fifteen Sub-Main Distribution boards Four Motor Control Center boards Twenty-four Final Distribution boards with control & contactors for lighting |
Petra Food Factory
Contractor | Al-Sayyar for Electrical Engineering |
Commissioning Date | 2013 |
Scope of Supply | One Main Distribution board, Form-IV, fed from one transformer- 1.5MVA One Automatic Transfer Switch- 2500A Five Sub-Main Distribution boards Five Motor Control Center boards One Power Factor Compensation panel- 500kvar Thirty-Five Final Distribution boards with control & contactors for lighting |
1MWp PV system in Ma’an Development Area
Owner | Ma’an Development Area |
Contractor | Mustakbal Clean Tech |
Commissioning Date | 2013 |
Scope of Supply | Two Main Distribution boards Two Sub-Main Distribution board |
AL- Gardens Hospital
Owner | AL- Gardens Hospital |
Contractor | Venice for Contracting |
Commissioning Date | 2013/2012 |
Scope of Supply | One Main Distribution board, Form-IV, fed through two transformers- 1.5MVA each, that consists of two main incomers, motorized ACB’s, with bus-coupler complete with electrical & mechanical interlock Eighteen Sub-Main Distribution boards Seven Motor Control Center boards Two Power Factor Compensation panels- 400kvar Forty-three Final Distribution boards with control & contactors for lighting |
8000A Synchronizing Panel- Dream City Project- Iraq
Owner | Modern Iraqi for Trading Agencies |
Contractor | Modern Iraqi for Trading Agencies |
Commissioning Date | 2012 |
Scope of Supply | One Synchronizing panel for four Generators, that consists of six 1600A motorized ACB’s & two 1000A outgoing MCCB’s & six 630A outgoing MCCB’s, with load sharing & load Demand, all control and bus bars |
Arab Pharmaceutical Manufacturing (APM)
Owner | Arab Pharmaceutical Manufacturing (APM). |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2012 |
Scope of Supply | One Main Distribution board (type tested assemblies/PRISMA Plus-P), Form-IV, fed through one transformer- 1.5MVA One Automatic Transfer Switch- 630A Six Sub-Main Distribution boards Four Motor Control Center boards One Power Factor Compensation panel- 450kvar Eleven Final Distribution boards with control & contactors for lighting |
Dar Al-Dawa Pharmaceutical Co.- General Formulation Plant
Owner | Dar Al dawa |
Consultant | Alpha Ref. & Air Cond. Est. |
Contractor | Alpha Ref. & Air Cond. Est. |
Commissioning Date | 2012/2011 |
Scope of Supply | Two Main Distribution boards, Form-IV, fed through two transformers- 1.5MVA each, that consist of two main incomers, motorized ACB’s, with Bus- coupler complete with electrical & mechanical interlock Twenty Sub-Main Distribution boards Fifteen Motor Control Center boards Four Power Factor Compensation panels- 400kvar Thirty-two Final Distribution boards with control & contactors for lighting |
10000A Synchronizing Panel- Iraq
Owner | Modern Iraqi for Trading Agencies |
Contractor | Modern Iraqi for Trading Agencies |
Commissioning Date | 2011 |
Scope of Supply | One Synchronizing panel for Six Generators, that consists of six 2000A motorized ACB’s & six 2000A outgoing MCCB’s, with load sharing & load Demand, all control and bus bars |
Royal Jordanian Headquarter
Owner | Royal Jordanian |
Contractor | Haddadinco |
Commissioning Date | 2011 |
Scope of Supply | Two Main Distribution boards, Form-IV, fed through two transformers- 1.5MVA each, that consist of two main incomers, motorized ACB’s, with Bus- coupler complete with electrical & mechanical interlock Twenty-Two Sub-Main Distribution boards Fourteen Motor Control Center boards Four Power Factor Compensation panels- 400kvar Sixty-three Final Distribution boards with control & contactors for lighting |
Gargour& Fils Auto Center- Wadi Al-Seer
Owner | T. Gargour & Fils Auto Company |
Consultant | Karim Bawab & Co. |
Contractor | T. Gargour & Fils Auto Company |
Commissioning Date | 2010 |
Scope of Supply | One Main Distribution board, fed from one transformer- 0.6MVA Four Sub-Main Distribution boards Three Motor Control Center boards Twenty Final Distribution boards with control & contactors for lighting |
Modern Arab Distribution Company
Owner | Nader Group |
Contractor | Awwabeen Contracting Company |
Commissioning Date | 2010 |
Scope of Supply | One Main Distribution board, fed from one transformer- 0.4MVA Two Sub-Main Distribution boards Two Motor Control Center boards One Automatic Transfer Switch-100A Ten Final Distribution boards with control & contactors for lighting |
6300A Synchronizing Panel- Kardo Group- Iraq
Owner | Modern Iraqi for Trading Agencies |
Contractor | Modern Iraqi for Trading Agencies |
Commissioning Date | 2010 |
Scope of Supply | One Synchronizing panel for five Generators, that consists of five, 1250A motorized MCCB’s & two 3200A MCCB’s, with all control and bus bars |
MTN (Telecommunication Company)- Yemen
Owner | MTN Company |
Contractor | Technohouse Engineering & Contracting |
Commissioning Date | 2009 |
Scope of Supply | Two Main Distribution boards, Form-IV, fed through two transformers- 1.5MVA each, that consist of two main incomers, motorized ACB’s, with bus-coupler complete with electrical & mechanical interlock Two Automatic Transfer Switches- 2500A Ten Sub-Main Distribution boards Eight Motor Control Center boards Four Power Factor Compensation panels- 450kvar Thirty Final Distribution boards with Control & contactors for lighting. |
5000A Synchronizing Panel (Auchan Project)- Iraq
Owner | Modern Iraqi for Trading Agencies |
Contractor | Modern Iraqi for Trading Agencies |
Commissioning Date | 2009 |
Scope of Supply | One Synchronizing panel for four generators, that consists of four 1600A motorized MCCB’s & two 2000A MCCB’s, with all control and bus bars |
Al-Hamshari Group Building
Owner | Al-Hamshari Group |
Contractor | Al-Sayyar for Electrical Engineering |
Commissioning Date | 2008 |
Scope of Supply | One Main Distribution board Two Motor Control Center boards Two Sub-Main Distribution boards Fourteen Final Distribution boards with control & contactors for lighting |
Union Tobacco Ware House
Owner | Union Tobacco |
Consultant | UCS- Universal Consultancy Services |
Contractor | Eng. Nabil Sehani Co. |
Commissioning Date | 2008 |
Scope of Supply | One Sub-Main Distribution board Eight Final Distribution boards with control & contactors for lighting |
Coca Cola Factory- Yemen
Owner | Aden Beverage and Industrial Co. |
Contractor | Technohouse Engineering & Contracting |
Commissioning Date | 2008 |
Scope of Supply | One Main Distribution boards, Form-IV, fed through one transformer- 2MVA Six Sub-Main Distribution boards Four Motor Control Center boards One Power Factor Compensation panels- 600kvar Twenty-three Final Distribution boards with control & contactors for lighting |
Jingo’s Jungle
Owner | Carnival Amusements & Entertainment Co. |
Contractor | Awwabeen Contracting Company |
Commissioning Date | 2008 |
Scope of Supply | One Main Distribution Board Two Motor Control Center boards Four Sub-Main Distribution boards Four Final Distribution boards with control & contactors for lighting |
Main Data Center for Orange Company- (Prince Hashem Station)
Owner | Jordan Telecom Group- Orange |
Commissioning Date | 2008 |
Scope of Supply | Supply, install and commission of low voltage switchgear cabinets including all cable installations and terminations (power and data cables) with all cable trays and accessories Execute a grounding system according to ANSI J-STD- 607- A standard Lightning System (Meshed Cages) according to IEC 62305-2 |
ACT Administration Building
Owner | Aqaba Container Terminal |
Contractor | Mag Engineering & Contracting Co. |
Commissioning Date | 2008- 2007 |
Scope of Supply | Two Main Distribution boards Two Motor Control Center boards One Sub-Main Distribution board Fifteen Final Distribution boards with control & contactors for lighting |
Union Tobacco Administration Building
Owner | Union Tobacco |
Consultant | UCS- Universal Consultancy Services |
Contractor | Eng. Nabil Sehani Co. |
Commissioning Date | 2008-2007 |
Scope of Supply | One Main Distribution board One Motor Control Center board One Sub-Main Distribution board Four Final Distribution boards with control & contactors for lighting |
ABC Department Store
Owner | Al-Baraka Mall |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2008-2007 |
Scope of Supply | One Main Distribution board One Motor Control Center board Three Sub-Main Distribution boards Two Final Distribution boards with control & contactors for lighting |
Integrated Wood Industry Factory
Owner | الشركة الاردنية الخليجية لصناعة المفروشات |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2008-2007 |
Scope of Supply | One Main Distribution Board Eight Sub-Main Distribution boards Three Motor Control Center boards One Power Factor Compensation panel- 350kvar |
6000A Synchronizing Panel
Owner | S.E.T.I |
Contractor | S.E.T.I |
Commissioning Date | 2008-2007 |
Scope of Supply | One Synchronizing panel for three Generators that consist of three motorized ACB’s with all control and bus bars |
Infrastructure Upgrading & Renovation of Switchgear Panels for Orange Company- (Al-Abdali Station)
Owner | Jordan Telecom Group- Orange |
Commissioning Date | 2007 |
Scope of Supply | Supply, Install and Commission: Automatic Transfer Switch- 1000A, 4-pole One two-way Automatic Transfer Switch- 1000A and by-pass switch |
Jordan Media Center
Owner | Jordan Media Center |
Contractor | Al-Muntaser Engineering Contracting Co. |
Commissioning Date | 2007 |
Scope of Supply | One Main Distribution Board that consists of two main incomers & one bus-coupler Two Motor Control Center boards Five Sub-Main Distribution boards One Power Factor Compensation panel- 300kvar. |
Infrastructure Upgrading & Renovation of Switchgear Panels for Orange Company- (Tlaa’ Al-Ali Branch)
Owner | Jordan Telecom Group- Orange |
Commissioning Date | 2007-2006 |
Scope of Supply | Supply, Install and Commission: One Main Distribution board One two-way Automatic Transfer Switch- 1000A and by-pass switch |
City Mall Project
Owner | Al-Khayer Real Estate Investment Company |
Consultant | UCS- Universal Consultancy Services |
Contractor | Alpha Refrigeration & Air Conditioning Est. |
Commissioning Date | 2007- 2005 |
Scope of Supply | Six LV Transformer panels, Form-IV Six Main Distribution boards, Form-IV Twelve Motor Control Center boards, Form-II Twenty Six Sub-Main Distribution boards, Form-II Three Power Factor Compensation panels, two 450kvar & one 150kvar Final Distribution boards |
Infrastructure Upgrading & Renovation of Switchgear Panels for Orange Company- (Prince Hashem Station)
Owner | Jordan Telecom Group- Orange |
Commissioning Date | 2006 |
Scope of Supply | Supply, Install and Commission: One Automatic Transfer Switch- 1000A, 4-pole A new controlling and monitoring micro- processor based panel for existing Generator |
Infrastructure Upgrading & Renovation of Mobilecom Main Building- (7th Circle Branch)
Owner | Jordan Telecom Group- Orange |
Commissioning Date | 2006-2005 |
Scope of Supply | Supply, install and commission of Automatic Transfer Switch- 1000A, 4-pole |
Infrastructure Upgrading & Renovation for Military Hospitals/ King Hussein Medical City
Owner | Armed Jordan Forces Royal Medical Services |
Consultant | Arabtech Jardaneh Consulting Engineers & Architects |
Contractor | Anass Anani & Partners Contracting Co. |
Commissioning Date | 2003- 2002 |
Scope of Supply | Three Main Distribution boards, Prisma Form-IV, ASTA type tested (authorized by Schneider Electric) Nine Motor Control Center boards, Form-II Seventeen Sub-Main Distribution boards Two Power Factor Compensation panels- 450kvar & 180kvar Final Distribution boards |
Infrastructure Upgrading & Renovation for Military Hospitals/ Prince Hashim Hospital
Owner | Armed Jordan Forces Royal Medical Services |
Consultant | Arabtech Jardaneh Consulting Engineers & Architects |
Contractor | Haddadin Engineering Co. for Contracting |
Commissioning Date | 2003- 2002 |
Scope of Supply | Three Main Distribution boards, Prisma Form-IV, ASTA type tested (authorized by Schneider Electric) Seven Motor Control Center boards Form-II Two Sub-Main Distribution boards Two Power Factor Compensation panels- 300kvar & 120kvar Final Distribution boards |
Amman Water Project- C9
Owner | Water Authority of Jordan |
Consultant | SEGMA |
Contractor | Hussein Attieh Contracting Est. |
Commissioning Date | 2002 |
Scope of Supply | Main Distribution board Twelve Soft Starters- up to 450kW Four Variable Speed Drives One master PLC unit Eight Remote Telemetric units (RTU’s) One Main Mimic panel to control & monitor the system of each site SCADA system Wireless system for five sites Training of operators |
Amman Water Project- C2
Owner | Water Authority of Jordan |
Consultant | SEGMA |
Contractor | Hussein Attieh Contracting Est. |
Commissioning Date | 2002 |
Scope of Supply | One Motor Control Center board Two Autotransformer Starters- 90kWEach One master PLC unit Three Remote Telemetric units (RTU’s) One Mimic panel to control & monitor the whole system including the MV Pumps SCADA system Training of operators |
Farah Hospital
Owner | Farah Hospital |
Consultant | MEDA Consulting Engineers |
Contractor | Modern Maintenance Company |
Commissioning Date | 2001 |
Scope of Supply | Main Distribution board, fed through two transformers- 1500 MVA each Fifteen Sub-Main Distribution board Six Motor Control Center boards, Form-IV, with provision of remote control through BMS Two Power Factor Compensation boards- 400kvar each |
Wadi Mousa Water Supply & Waste Water- Project No. 2W
Owner | Water Authority of Jordan |
Consultant | CDM International Inc. |
Contractor | Sadeq Naief & Partners Contracting Company |
Commissioning Date | 2000 |
Scope of Supply | Three Autotransformer Starters- 320kW, located in the Pumping Stations One master PLC unit Seven Remote Telemetric Units (RTU’s) One Mimic panel to control & monitor the whole system SCADA system Training of operators |
Wadi Mousa Water Supply & Waste Water- Project No. 1W
Owner | Water Authority of Jordan |
Consultant | CDM International Inc. |
Contractor | Diran Contracting Company |
Commissioning Date | 2000 |
Scope of Supply | One Autotransformer Starter- 320kW One master PLC unit Two Remote Telemetric Units (RTU’s) One Mimic panel to control & monitor the whole system SCADA system Training of operator |